Skip to content
Geralds Energy Resources Nigeria Ltd

Procurement · Wellhead · Christmas Tree

Critical equipment. Coordinated from sourcing to support.

Integrated procurement, equipment supply, technical support and lifecycle management for energy and industrial operations.

Christmas tree wellhead assembly with red valve wheelsFig. 01 — Representative assembly

Procurement coverage

What Geralds sources.

  1. P-01

    Production equipment

  2. P-02

    Well-control systems

  3. P-03

    HSE equipment

  4. P-04

    Industrial consumables

  5. P-05

    Operational materials

Procurement lifecycle

Eight stages, one coordinated process.

Select a stage to read more.

Wellhead & Christmas Tree systems

Lifecycle support for well-control equipment.

Procurement and technical support for wellhead and Christmas Tree systems, associated well-control equipment and components used in drilling, completion, production, workover and intervention operations.

Discuss Wellhead Support
  1. 01

    Sourcing

  2. 02

    Procurement

  3. 03

    Assembly

  4. 04

    Testing

  5. 05

    Maintenance

  6. 06

    Repair

  7. 07

    Refurbishment

  8. 08

    Spares support

Technical specification panel

Requirement categories to prepare.

These are categories to consider when describing equipment — not values. The website does not validate engineering suitability.

Criterion 01

Working pressure

The pressure rating the equipment must be designed to withstand in service.

Include this detail in the inquiry form's requirement field.

Inventory & lifecycle support

Described support capabilities.

  • I-01Critical-spares planning
  • I-02Minimum / maximum stock levels
  • I-03Equipment traceability
  • I-04Inventory monitoring
  • I-05Emergency procurement
Equipment warehouse

Next step

Have a technical requirement?